Esteban Firpo · Miami Real Estate
Projects/Jean‑Georges Miami Tropic Residences

Jean‑Georges Miami Tropic Residences

From $1,100,000 · Completion 2028

  • Luxury residences curated by Chef Jean‑Georges
  • Airbnb‑friendly (subject to CU & permits)
  • Short‑term rentals allowed (Airbnb‑friendly) with no fixed minimum stay; City Certificate of Use and permits required
  • Unfurnished
Jean‑Georges Miami Tropic Residences

Gallery

  • Jean‑Georges Miami Tropic Residences — Gallery 1
  • Jean‑Georges Miami Tropic Residences — Gallery 2
  • Jean‑Georges Miami Tropic Residences — Gallery 3
  • Jean‑Georges Miami Tropic Residences — Gallery 4
  • Jean‑Georges Miami Tropic Residences — Gallery 5
  • Jean‑Georges Miami Tropic Residences — Gallery 6
  • Jean‑Georges Miami Tropic Residences — Gallery 7
  • Jean‑Georges Miami Tropic Residences — Gallery 8

Highlights

  • 49th‑floor skydeck with panoramic pool & Sky Bar

  • Residents‑only restaurant by Jean‑Georges; abc kitchens at grade

  • Full spa, indoor/outdoor fitness and squash court

  • Coworking, podcast studio, lounges and interior gardens

  • Prime location between Design District and Midtown

Unit mix

  • Studios and 1-4 BR · ~852-2,892 sq ft

Features

  • Chef kitchens with Gaggenau appliances

  • Natural stone counters; Gessi fixtures

  • Floor‑to‑ceiling glass, 10–11 ft ceilings and private balconies

  • Private/semi‑private elevator foyers

Why Jean‑Georges Miami Tropic Residences?

  • Luxury residences curated by Chef Jean‑Georges

  • Airbnb‑friendly (subject to CU & permits)

FAQs

Rental policy?
Short‑term rentals allowed (no fixed minimum). City Certificate of Use and short‑term rental permits required. Check availability by typology
Furnishing?
Delivered fully finished; furniture not included. Optional furniture packages available. Request materials (PDF)
Starting prices?
1‑bed from ~$1.1M; 2‑bed ~$2.2M; 3‑bed ~$3.3M; 4‑bed ~$4.9M (subject to availability).
Deposit schedule?
20% at contract · 10% at groundbreaking · 10% at top‑off · 60% at closing.
Completion?
Estimated late‑2027 / early‑2028 (construction commencing 2025).
Schedule MeetingWhatsAppEmail Esteban

Payment plan

  1. 20% at contract

  2. 10% at groundbreaking

  3. 10% at top‑off

  4. 60% at closing

Location